Specification
Item |
Unit |
Standard |
D10 |
um |
11.432 |
D50 |
um |
17.018 |
D90 |
um |
25.489 |
Tap-Density |
g/cm3 |
1.32 |
Specific surface area |
m2/g |
1.10 |
First discharge capacity |
mAh/g |
333.1 |
First efficiency |
% |
94.5 |
Product SEM
--In 2003, enter lead acid battery renewable source utilize field and build the Linyi factory
2003 Inbetter Gelon Co., Ltd started in Linyi, Shandong;
-- In 2006 LinYi DaKe Trade Co., Ltd. Was set up in LinYi;
2006 Inbetter Gelon Co., Ltd set up the new energy group and enter the new energy materials field
--In 2007 LinYi Gelon New Battery Materials Co., Ltd was set up in LinYi;
--In 2009 LinYi E-Battery Co., Ltd. Was set up in LinYi;
--In 2011, LinYi Gelon LIB Co., Ltd. Was set up in LinYi; The same year, Gelon LIB Co...Limited was set up in HongKong;
--In 2013, we set up Dongguan Inbetter Gelon Co., Ltd;
May of 2013, LinYi E-Battery Co., Ltd. Established three production lines for 18650 cylinder Lithium ion battery;
--In 2013, LinYi Gelon LIB Co. Was promoted to ShanDong Gelon LIB Co.
We also could supply all materials and full sets equipments for Li-ion battery.
1. )full set of lithium battery materials, including:
LiMn2O4, LTO, LiNiMnCoO2(NMC), LiCoO2, Graphite(MCMB)and other cathode&anode battery materials; Aluminum foil, copper foils, battery separator, etc.
2. )full set of lithium battery equipments, for example:
Mixing machine --coating machine--oven--rolling machine--welding machine--slitting / cutting machine --winding machine--sealed machine, etc
3)full set of lithium battery technology
4)we can design the laboratory and production line, according to customer's request
PROJECT EXPERIENCES:
Bolivia TURN KEY PROJECT SUCCESSFULLY COMPLETE
Now we have successfully completed the lithium battery production line project (including mobile phone battery and E-bike battery production line project, and lab. Line ) with Bolivia government. All of the materials, equipments and technology that used in the project is provided by our company.
The produced battery performance is very good, highly praised by Bolivia president.
And president personally attend the celebration dinner and take photos with our manager as a commemorate.
Next project we will cooperate with Indonesia government.
Want to research lithium ion battery? We can design battery research lab and pilot plant, provide technology, material, equipment for you.